Our Advantages:
1. More than 30 years experience in designing & manufacturing of rubber machines.
2. Jerry-build & inferior quality are never allowed.
3. Powerful technical team for customized service & professional oversea technical guide.
4. Strong processing capability for the most efficient machine delivery.
XPG-600 rubber sheet batch-off cooler, batch-off cooler, rubber sheet batch-off cooling machine
Machine Usage:
Rubber feed is pressed into rubber sheet after plasticating or mixing. This cooler can coat, cool, dry rubber sheets which are of high temperature and then be folded into a pile.
Machine Introduction:
This machine adopts floor standing structure, with the character of simple and proper structure, flexible operation.
This cooler line includes main host and electrical controlling system. Main host includes front access device, press jointed device, printing device, slitting device, cooling & release agent mixing device, rubber sheets lifting device, rubber sheet hanging device, rear access device, cross cutting device, automatic rubber sheet pick up device, rubber sheet wagging device and escalating equipment
Machine Features:
1. Durable machine body with sufficient raw material applied.
2. Reliable machine quality with superior accessories chosen.
3. Latest machine design.
4. Less maintenance needed.
5. Easy installation.
6. Environment protection.
7. High safety configuration & humanization design.
8. High automation.
9. High efficiency and superior cooling performance.
10. Low power consumption & labor saving.
11. Low noise & long service life.
Technical Parameters:
Model |
XPG-600 |
XPW-600 |
XPG-800 |
XPG-900 |
Structure Type |
Floor-standing type |
Chain-Belt type |
Overhead type |
Overhead type |
Max. Rubber Sheet Width (mm) |
600 |
600 |
800 |
900 |
Rubber Sheet Thickness (mm) |
4-10 |
2-12 |
4-10 |
6-12 |
Rubber Sheet Temperature After Cooling (ºC) |
10 |
10 |
15 |
5 |
Linear Speed of taking-in conveyor (m/min) |
3-24 |
3-24 |
3-35 |
4-40 |
Linear speed of sheet-hanging chain (m/min) |
0.82 |
Chain-belt layer number: 5 |
0.117-1.17 |
4-40 |
Hanging height of the sheet hanging bar (m) |
1000-1500 |
No |
1000-1500 |
1400 |
No. of cooling fans (set) |
12 |
|
20 |
18-26 |
Total power (kw) |
13.7 |
|
28.8 |
18-34 |
Overall Dimension(mm) |
L |
1425 |
|
16800 |
26630 |
W |
4500 |
|
4700 |
3500 |
H |
3405 |
|
3520 |
5630 |
Our Service:
1. Our engineer team can design customized machines for you and send the drawings for confirm.
2. The wires' connection from control box to operation box is finished before delivery. The user only needs to connect the outside wire to the controlling box.
3. Each machine is tested running with load at our factory before delivery to guarantee each parts working well.
4. Foundation drawings, detailed machine assembly drawings & parts drawing, user guide and maintenance manual will be supplied before the delivery.
5. Custom clear documents required in destination port, such as B/L, commercial invoice, packing list, insurance policy, C/O will be supplied once upon the delivery.
6. Oversea technical support can be offered as per request.
Machine Delivery:
FAQ:
1. Delivery time of the rubber machines?
Normally it needs about 25 days to 3 months according to the ordered machines' size and quantity.
2. What does your factory do regarding quality control?
We have the most professional engineer team to design the correct machines at the beginning, equip with the most advanced processing device to process the machine parts during the production period and finally arrange the most experienced assembly workers to assemble and check the final machines to 100% guarantee the superior quality and stable performance of each machine.
3. How long is your machines' warranty period?
The warranty period for our machines is one year from the day of normal working at the user plant.
4. Are you able to give installation and commissioning overseas? How long time will it take?
Yes, we can supply overseas service and technical support at the user plant with the charge of the required cost.
Small machines normally takes within 1~3 days.
Large machines normally takes about 30 days.
5. How can we go to your side for a factory visit?
We are located in Qingdao City, Shandong province, China. The nearest airport is Qingdao liuting airport.
Please advise us your time schedule in advance for us to pick up you at the airport.