Our Advantages:
1. More than 30 years experience in designing & manufacturing of rubber machines.
2. Jerry-build & inferior quality are never allowed.
3. Powerful technical team for customized service & professional oversea technical guide.
4. Strong processing capability for the most efficient machine delivery.
XY-3I 230X630 3 Roller Calender, Rubber Roller Calender, Three Roller Calender
Machine Usage:
Roller calenders are mainly used for rubber sheet outputting, cord(including cotton or synthetic fiber,steel wire),canvas and fabric fractioning, cord single or double-coating with one time connectively as sheet with plastics and rubber and coating sheet of inner liner of radial tire.
Machine Introduction:
This three roller calender mainly consist of machine base, machine frame, rollers, roller bearings assembly, roller adjusting device, transmission device, cooling device, safety brake device, motor and speed reducer device, electrical control system etc.
1.Whole steel cast base and frame.
2. Chilled cast rollers with 68-72HSD hardness.
3. Bearing type bushing contains cast steel housing and high strength bearing at inside.
4. Magnetic plug brake device.
5. Movable& non-movable stop guide are both available.
6. Hard tooth gear reducer with forced recycled spray lubrication type & high transmission efficiency.
7. Overload protection device is equipped to avoid machine damage.
8. Automatic hydraulic stock blender is optional as per your request.
Machine Features:
1. Durable machine body with sufficient raw material applied.
2. Reliable machine quality with superior accessories chosen.
3. Latest machine design.
4. Less maintenance needed.
5. Easy installation.
6. Environment protection.
7. High safety configuration & humanization design.
8. High automation.
9. High efficiency and superior mixing performance.
10. Low power consumption & labor saving.
11. Low noise & long service life.
Technical Parameters of Our 3 Roller Calenders:
Model |
XY-3I Γ630 |
XY-3I Γ1120A |
XY-3I Γ1400 |
XY-3I Γ1500 |
XY-3I Γ1730 |
Roller Diameter (mm) |
230 |
360 |
400 |
450 |
610 |
Roller Working Length (mm) |
630 |
1120 |
1400 |
1500 |
1730 |
Speed Ratio |
1: 1: 1
1: 1.42: 1 |
1: 1: 1
0.733: 1: 1
0.733: 1: 0.733 |
1: 1: 1
1: 1.383: 1.383
1: 1.383: 1 |
1: 1: 1
1: 1.5: 1 |
1: 1: 1
1: 1.4: 1 |
Front
Roller Linear Speed(r/min) |
0.8-8 |
3-21.06 |
3-26.39 |
2.62-26.2 |
5.4-54 |
Nip Adjust Range (mm) |
0-7 |
0-10 |
0-10 |
0-10 |
0-20 |
Products Min Thickness (mm) |
0.2 |
0.2 |
0.2 |
0.2 |
0.15 |
Products Width(mm) |
100-500 |
500-1000 |
1200 |
1400 |
1400 |
Main Motor Power (kW) |
7.5 |
45 |
55 |
75 |
132 |
Overall Dimension(LxWxH)(mm) |
3168 |
5550 |
6500 |
7420 |
7010 |
890 |
1640 |
1500 |
2200 |
3950 |
1830 |
2120 |
2440 |
2900 |
3730 |
Weight(tons) |
~2.6 |
~11 |
~22 |
~26 |
~52 |
Our Service:
1. Our engineer team can design customized machines for you and send the drawings for confirm.
2. The wires' connection from control box to operation box is finished before delivery. The user only needs to connect the outside wire to the controlling box.
3. Each machine is tested running with load at our factory before delivery to guarantee each parts working well.
4. Foundation drawings, detailed machine assembly drawings & parts drawing, user guide and maintenance manual will be supplied before the delivery.
5. Custom clear documents required in destination port, such as B/L, commercial invoice, packing list, insurance policy, C/O will be supplied once upon the delivery.
6. Oversea technical support can be offered as per request.
Machine Delivery:
FAQ:
1. Delivery time of the rubber machines?
Normally it needs about 25 days to 3 months according to the ordered machines' size and quantity.
2. What does your factory do regarding quality control?
We have the most professional engineer team to design the correct machines at the beginning, equip with the most advanced processing device to process the machine parts during the production period and finally arrange the most experienced assembly workers to assemble and check the final machines to 100% guarantee the superior quality and stable performance of each machine.
3. How long is your machines' warranty period?
The warranty period for our machines is one year from the day of normal working at the user plant.
4. Are you able to give installation and commissioning overseas? How long time will it take?
Yes, we can supply overseas service and technical support at the user plant with the charge of the required cost.
Small machines normally takes within 1~3 days.
Large machines normally takes about 30 days.
5. How can we go to your side for a factory visit?
We are located in Qingdao City, Shandong province, China. The nearest airport is Qingdao liuting airport.
Please advise us your time schedule in advance for us to pick up you at the airport.