Our Advantages:
1. More than 30 years experience in designing & manufacturing of rubber machines.
2. Jerry-build & inferior quality are never allowed.
3. Powerful technical team for customized service & professional oversea technical guide.
4. Strong processing capability for the most efficient machine delivery.
XK-560 Open mixing mill, rubber mixing mill, rubber mixing machine, 2 roller rubber mill
Machine Usage:
This rubber mixing machine is mainly used for the plasticating of raw rubber, rubber compound mixing, rubber thermal refining and sheeting etc.
Machine Introduction:
The rubber mixing mill is mainly composed of machine body, driving system, nip adjusting device, safety brake equipment, pin universal coupling, emergency stopping device, etc.
1. Whole steel cast base and frame.
2. Chilled cast rollers with 68-72HSD hardness.
3. Bearing type bushing contains cast steel housing and high strength bearing at inside.
4. Fully closed type hardened surface gear speed reducer & high transmission efficiency.
5. Magnetic plug brake device.
6. Movable& non-movable stop guide are both available.
7. Overload protection device is equipped to avoid machine damage.
8. Automatic hydraulic stock blender is optional as per your request.
Machine Features:
1. Durable machine body with sufficient raw material applied.
2. Reliable machine quality with superior accessories chosen.
3. Latest machine design.
4. Less maintenance needed.
5. Easy installation.
6. Environment protection.
7. High safety configuration & humanization design.
8. High automation.
9. High efficiency and superior mixing performance.
10. Low power consumption & labor saving.
11. Low noise & long service life.
Technical Parameters:
Item |
XK-160 |
XK-250 |
XK-360 |
XK-400 |
XK-450 |
XK-550 |
XK-560 |
XK-660 |
XK-710 |
Roller diameter
(mm) |
160 |
250 |
360 |
400 |
450 |
550 |
560-510 |
660 |
710 |
Roller working length(mm) |
320 |
620 |
900 |
1000 |
1200 |
1500 |
1530 |
2130 |
2200 |
Front roller linear speed(r/min) |
9 |
16.3 |
16.7 |
19.3 |
21.8 |
22.5 |
27.2 |
28 |
31.9 |
Speed ratio of rollers |
1: 1.4 |
1: 1.1 |
1: 1.3 |
1: 1.3 |
1: 1.3 |
1: 1.2 |
1: 1.2 |
1: 1.2 |
1: 1.5 |
Max roller space (mm) |
4.5 |
8 |
10 |
10 |
12 |
16 |
15 |
0.5-15 |
0.5-15 |
Compound feeding capacity(KG) |
1-2 |
10-15 |
20-25 |
18-35 |
50 |
50-65 |
50-65 |
165 |
190 |
Motor power(KW) |
5.5 |
18.5 |
30 |
45 |
55 |
110 |
90 |
240 |
280 |
Dimensions(L× W× H) mm |
|
|
|
|
|
|
|
|
|
L |
1133 |
2722 |
4200 |
4920 |
5405 |
6646 |
6270 |
7280 |
8185 |
W |
920 |
1115 |
1780 |
1780 |
1740 |
2736 |
2282 |
3400 |
3910 |
H |
1394 |
1345 |
1760 |
1800 |
1790 |
2105 |
2000 |
2530 |
2270 |
Gross weight (tons) |
~2 |
~3.2 |
~6.5 |
~8 |
~11.4 |
~22 |
~22.5 |
~49 |
~51 |
Our Service:
1. Our engineer team can design customized machines for you and send the drawings for confirmation.
2. The wires' connection from control box to operation box is finished before delivery. The user only needs to connect the outside wire to the controlling box.
3. Each machine is tested running with load at our factory before delivery to guarantee each parts working well.
4. Foundation drawings, detailed machine assembly drawings & parts drawing, user guide and maintenance manual will be supplied before the delivery.
5. Custom clear documents required in destination port, such as B/L, commercial invoice, packing list, insurance policy, C/O will be supplied once upon the delivery.
6. Oversea technical support can be offered as per request.
Our Package & Delivery:
FAQ:
1. Delivery time of the rubber machines?
Normally it needs about 25 days to 3 months according to the ordered machines' size and quantity.
2. What does your factory do regarding quality control?
We have the most professional engineer team to design the correct machines at the beginning, equip with the most advanced processing device to process the machine parts during the production period and finally arrange the most experienced assembly workers to assemble and check the final machines to 100% guarantee the superior quality and stable performance of each machine.
3. How long is your machines' warranty period?
The warranty period for our machines is one year from the day of normal working at the user plant.
4. Are you able to give installation and commissioning overseas? How long time will it take?
Yes, we can supply overseas service and technical support at the user plant with the charge of the required cost.
Small machines normally takes within 1~3 days.
Large machines normally takes about 30 days.
5. How can we go to your side for a factory visit?
We are located in Qingdao City, Shandong province, China. The nearest airport is Qingdao liuting airport.
Please advise us your time schedule in advance for us to pick up you at the airport.